A placement checklist for a shelf reset
Open an approved plan on the shop floor. Read from the top shelf down and left to right, zoom in on a position and check its product and facing count. Mark that placement complete once the units are on the shelf. The next person can hide completed items and pick up where the first shift stopped.
Prepare labels from the same plan
Print a checklist or download it as a CSV for the reset. For a separate paper record with bay, completion and notes columns, preview the shelf reset workbook. Generate shelf labels from the plan to include its positions and facings, with optional prices and product codes. The shelf label guide explains the print options. For a single job outside the workspace, use the free shelf label maker.
Frequently asked questions
What happens if someone changes the draft during a reset?
The team works from the approved version while a planner edits the draft. Approving a newer version locks the old checklist and gives the team the new plan to follow. See the shelf planning workflow.
Can a team member reopen a finished placement?
Yes. Open the placement, review its saved status, then confirm the change. Other staff with access see its updated status. The store checklist guide walks through the review.
Does marking a placement complete change inventory?
Completion records progress on the reset. Use Inventory to receive, count or transfer physical units. Staff can complete the placement after checking the shelf against the drawing.