Meadow Corner preventive maintenance schedule
Meadow Corner · As of Mon, Nov 2, 2026 · Calendar to Sat, Jan 30, 2027
- Equipment
- 6
- Tasks
- 9
- Overdue
- 2
- Due
- 3
- Upcoming
- 4
Task status
| Equipment | Task | Frequency | Last done | Next due | Responsible |
|---|---|---|---|---|---|
| Drinks fridgeFRDG-01Shop floor, by the window | Check the door seal and clean the gasket | Monthly | Sat, Oct 31, 2026 | UpcomingMon, Nov 30, 2026Due in 28 days | Jordan Lee |
| Drinks fridgeFRDG-01Shop floor, by the window | Vacuum the condenser coils | Quarterly (3 months) | Tue, Jul 28, 2026 | OverdueWed, Oct 28, 20265 days overdue | Jordan Lee |
| Front till (POS terminal)TILL-01Front counter | Clean the receipt printer and paper path | Monthly | Tue, Oct 6, 2026 | DueFri, Nov 6, 2026Due in 4 days | Sam Taylor |
| Front till (POS terminal)TILL-01Front counter | Restart and install pending updates | Every 2 weeks | Wed, Oct 21, 2026 | DueWed, Nov 4, 2026Due in 2 days | Sam Taylor |
| Air conditioning unitAC-01Back office | Replace the air filter | Quarterly (3 months) | Tue, Sep 15, 2026 | UpcomingTue, Dec 15, 2026Due in 43 days | Alex Kim |
| Air conditioning unitAC-01Back office | Contractor service visit | Annually | Thu, Nov 20, 2025 | UpcomingFri, Nov 20, 2026Due in 18 days | Northside Cooling (contractor) |
| Step ladderSTEP-01Stockroom | Inspect the feet, treads and locking bar | Monthly | Wed, Sep 30, 2026 | OverdueFri, Oct 30, 20263 days overdue | Jordan Lee |
| Staff coffee machineCOFF-01Staff room | Descale | Every 45 days | Thu, Oct 1, 2026 | UpcomingSun, Nov 15, 2026Due in 13 days | Alex Kim |
| Entrance door closerDOOR-01Front entrance | Check the closing speed and lubricate the hinges | Every 6 months | No record | DueMon, Nov 2, 2026No last done date: treat as due now | Unassigned |
Calendar: next 90 days
| Date | Equipment and task | Responsible | Done |
|---|---|---|---|
| Overdue | |||
| Wed, Oct 28, 2026Overdue | Drinks fridge (FRDG-01)Vacuum the condenser coilsQuarterly (3 months) | Jordan Lee | |
| Fri, Oct 30, 2026Overdue | Step ladder (STEP-01)Inspect the feet, treads and locking barMonthly | Jordan Lee | |
| November 2026 | |||
| Mon, Nov 2, 2026Due | Entrance door closer (DOOR-01)Check the closing speed and lubricate the hingesEvery 6 months · no last done date | Unassigned | |
| Wed, Nov 4, 2026Due | Front till (POS terminal) (TILL-01)Restart and install pending updatesEvery 2 weeks | Sam Taylor | |
| Fri, Nov 6, 2026Due | Front till (POS terminal) (TILL-01)Clean the receipt printer and paper pathMonthly | Sam Taylor | |
| Sun, Nov 15, 2026 | Staff coffee machine (COFF-01)DescaleEvery 45 days | Alex Kim | |
| Wed, Nov 18, 2026 | Front till (POS terminal) (TILL-01)Restart and install pending updatesEvery 2 weeks | Sam Taylor | |
| Fri, Nov 20, 2026 | Air conditioning unit (AC-01)Contractor service visitAnnually | Northside Cooling (contractor) | |
| Mon, Nov 30, 2026 | Drinks fridge (FRDG-01)Check the door seal and clean the gasketMonthly | Jordan Lee | |
| Mon, Nov 30, 2026 | Step ladder (STEP-01)Inspect the feet, treads and locking barMonthly | Jordan Lee | |
| December 2026 | |||
| Wed, Dec 2, 2026 | Front till (POS terminal) (TILL-01)Restart and install pending updatesEvery 2 weeks | Sam Taylor | |
| Sun, Dec 6, 2026 | Front till (POS terminal) (TILL-01)Clean the receipt printer and paper pathMonthly | Sam Taylor | |
| Tue, Dec 15, 2026 | Air conditioning unit (AC-01)Replace the air filterQuarterly (3 months) | Alex Kim | |
| Wed, Dec 16, 2026 | Front till (POS terminal) (TILL-01)Restart and install pending updatesEvery 2 weeks | Sam Taylor | |
| Wed, Dec 30, 2026 | Front till (POS terminal) (TILL-01)Restart and install pending updatesEvery 2 weeks | Sam Taylor | |
| Wed, Dec 30, 2026 | Step ladder (STEP-01)Inspect the feet, treads and locking barMonthly | Jordan Lee | |
| Wed, Dec 30, 2026 | Staff coffee machine (COFF-01)DescaleEvery 45 days | Alex Kim | |
| Thu, Dec 31, 2026 | Drinks fridge (FRDG-01)Check the door seal and clean the gasketMonthly | Jordan Lee | |
| January 2027 | |||
| Wed, Jan 6, 2027 | Front till (POS terminal) (TILL-01)Clean the receipt printer and paper pathMonthly | Sam Taylor | |
| Wed, Jan 13, 2027 | Front till (POS terminal) (TILL-01)Restart and install pending updatesEvery 2 weeks | Sam Taylor | |
| Wed, Jan 27, 2027 | Front till (POS terminal) (TILL-01)Restart and install pending updatesEvery 2 weeks | Sam Taylor | |
| Thu, Jan 28, 2027 | Drinks fridge (FRDG-01)Vacuum the condenser coilsQuarterly (3 months) | Jordan Lee | |
| Sat, Jan 30, 2027 | Step ladder (STEP-01)Inspect the feet, treads and locking barMonthly | Jordan Lee | |
Overdue tasks are listed once, at their missed date. Later dates repeat from the last done date, so record the new date when a task is done. A monthly task done on the 31st falls on the last day of shorter months.
Follow the manufacturer’s instructions and any inspection rules that apply where you are. This is a plan only; nothing is booked or sent.