Reorder point: two numbers that make reordering easier
How long your stock will last and the stock level that should prompt an order, with fictional examples for a steady seller, a slow import and an unreliable delivery.
Reordering by eye works until a busy week empties a shelf before anyone notices. Two numbers worked out from your own sales make the decision routine. One says how many days your stock will last. The other is the stock level at which you place an order. To try the arithmetic on one product, the free trigger level calculator works out that level, and the buffer calculator turns buffer days into units.
Days of cover
This figure is stock on hand divided by average daily sales. With 40 units on hand and sales of 8 a day, you have 5 days of stock left. If your supplier takes 7 days to deliver, you are already 2 days late, and the shelf will sit empty until the order arrives.
The same measure is sometimes called days of supply, and the free days of supply calculator works it out for one product. It rests on two inputs:
- Stock on hand is what you counted or recorded, not what you think is there. An uncounted product has no cover figure at all.
- Average daily sales is units sold over a recent window divided by the days in that window. A 30 day window suits most products. A 7 day window reacts faster to a change, and a 90 day window smooths out a product that sells a few units at a time.
Count the days with no sales, or the average comes out too high.
Reorder level and the reorder point formula
The two names mean the same number: the stock level at which you place a new order, worked out the same way. It is the stock you will sell while a new delivery is on its way, plus a buffer:
Trigger level = average daily sales × (supplier lead time + safety days)
The first part, daily sales times lead time, is the lead time demand. It is the units you expect to sell between placing an order and receiving it. The second part covers the things that go wrong. A busy weekend, a late truck or a short shipment all eat into the stock you planned to have.
Textbooks express the buffer as safety stock, a quantity of units worked out from how much demand and lead time vary (MIT covers the statistical models in its logistics and supply chain management course). Expressing it in days keeps it in proportion to the product. Three safety days is 24 units for a product that sells 8 a day and 3 units for one that sells 1 a day. For a small store without years of clean data, days are easier to set and explain.
The free calculator takes the buffer in units and rounds the total up to a whole unit, and the two forms agree. Its sample of 6 a day, a 5 day lead time and 12 buffer units gives 6 × 5 + 12 = 42, the same as 6 × (5 + 2 safety days).
How to calculate reorder point
- Choose a sales window, such as the last 30 days.
- Divide units sold in that window by its number of days to get average daily sales.
- Ask your supplier for the usual lead time in days, from order to goods on the shelf.
- Pick the safety days: more for a product with an unreliable supplier or uneven sales, fewer for a steady one.
- Multiply average daily sales by lead time plus safety days. When stock on hand is at or below that number, order.
This is the standard method from operations courses, with a fixed number of days in place of the statistical buffer.
How to set reorder levels
The same formula behaves differently from product to product. The three below are fictional, from one fictional corner shop.
A steady seller with a short lead time
The shop sells 210 chocolate bars in 30 days, or 7 a day, and sales barely change from week to week. A local wholesaler delivers 2 days after an order and is rarely late, so 1 safety day is enough.
- Lead-time demand: 7 × 2 = 14 bars
- Buffer: 7 × 1 = 7 bars
- Trigger level: 14 + 7 = 21 bars, the same as 7 × (2 + 1)
Twenty-one bars is 3 days of stock, so a close, reliable supplier lets the shop hold little.
A slow seller with a long lead time
The shop sells 45 imported ceramic mugs in 90 days, or 0.5 a day; the longer window smooths out weeks with no sales. The supplier ships from overseas and quotes 30 days from order to shelf, so the shop allows 10 safety days.
- Lead-time demand: 0.5 × 30 = 15 mugs
- Buffer: 0.5 × 10 = 5 mugs
- Trigger level: 15 + 5 = 20 mugs, the same as 0.5 × (30 + 10)
Twenty mugs looks like plenty for an item that sells one every other day, but the next delivery is a month away. This is the product that reordering by eye misses.
A product whose lead time and sales vary
The shop sells 180 bags of dog food in 30 days, or 6 a day. The supplier usually takes 5 days, but the last five deliveries took 5, 6, 5, 9 and 7 days. The busiest recent week sold 56 bags, or 8 a day. With no buffer, the level would be 6 × 5 = 30 bags, and the 9 day delivery would have left the shelf empty for 4 days. The shop sizes its buffer from that 4 day delay:
- Lead-time demand: 6 × 5 = 30 bags
- Buffer: 6 × 4 = 24 bags
- Trigger level: 30 + 24 = 54 bags, the same as 6 × (5 + 4)
Fifty-four bags covers a 9 day wait at normal sales (6 × 9 = 54) or a busy week with an on-time delivery (8 × 5 = 40). Both at once would take 8 × 9 = 72, and holding stock for every worst case costs cash and shelf space, so decide which risk the buffer is for. A statistical buffer tutorial from NC State's Supply Chain Resource Cooperative sizes it from the spread of demand and lead times instead.
How much to order
The trigger tells you when. The quantity depends on how often you check stock. If you review stock every 7 days, the next order has to last until the review after the delivery, or you will be back at the trigger with no time to react.
Order up to = average daily sales × (lead time + safety days + review days), rounded up
Subtract stock on hand from that figure to get the units to order. For the dog food with a 7 day review, the target is 6 × (5 + 4 + 7) = 96 bags, so with 50 on hand the order is 46. Rounding up keeps a slow seller from being ordered a fraction short. If the cost of placing each order matters more than the review rhythm, an economic order quantity calculator balances ordering cost against holding cost instead.
When to reorder inventory
Check the numbers on a fixed schedule, the same number of days apart as the review days in your formula. At each review, order every product at or below its trigger and leave the rest. Between reviews, a product that sells faster than usual can still cross its trigger, which is what the safety days are for. The guide on how to prevent stockouts in a small shop covers the other causes of empty shelves, such as records that drift and slow deliveries.
When to recheck the levels
A level is only as good as the sales rate and lead time behind it. Work it out again when:
- The season turns. A rate from a quiet month is too low for a busy one. Use last year's same weeks or add safety days, then lower the level afterward.
- A supplier changes. A new supplier or delivery day changes the lead time. Time the first few deliveries rather than trusting the quote.
- You run out. Check whether the level was too low, the delivery late or the record wrong before raising the buffer. A wrong count needs a recount, not more stock.
- Stock piles up. If a product is still far above its level when a delivery lands, cut safety days for a reliable supplier or order less each time. The dead stock guide covers goods that stopped moving.
Turning the trigger into an alert
Once you have a trigger level, you can enter it as a low stock threshold so the system flags the product for you. In Headoffis, Count / alerts sets an optional alert level for each product at each location, and Alerts lists everything at or below it. A blank level turns the alert off, and restocking above the level clears the alert. Each alert checks one location, so a level for the whole store fits best where the product is kept in one place.
The Sales & stats page shows units per day, current stock and cover for the last 7, 30 or 90 days. Its replenishment settings hold one lead time, one number of safety days and one review interval for the whole business, so a product like the mug may need its own alert level. Suggestions use the trigger and order-up-to formulas above, with the suggested quantity rounded up, and show units held at other locations so you can transfer before you buy.
Suggestions do not move stock or contact a supplier. Create purchase order pre-fills a draft from them for you to check, assign to a supplier and mark as sent. Units outstanding on sent orders are not yet subtracted from the suggestions, so check open orders first. The replenishment help explains each setting.
What the numbers miss
Both numbers look backwards. They do not know about a delivery on its way, a promotion next week or a season starting. On Sales & stats the current day is part of the window, so a morning check sees only part of today's sales.
Use the numbers to decide what to check, then use what you know about the store to decide what to order. Test expected unit sales ahead of seasonal turns with the free demand forecast tool, and check MIT's course on supply chain planning for forecasting and inventory reorder policies in depth.